Abbottabad Development Authority, Abbottabad invites sealed Bids from eligible firms/contractor in accordance with KPPRA procurement rules 2014 on single stage single envelop, procedure for the following works. The Bidder should be registered with Pakistan Engineering Council (PEC) in relevant category & field of specialization, enlisted with ADA, Abbottabad and should have adequate financial soundness, relevant experience, personnel capabilities, required equipment and others.

S. #

Name of Work

E/Cost

Bid Security

Tender Form Fee

Last date of submission & time

Date of opening and time

Period of completion

1

9-Nos Hand Pumps 

(5Nos in i. Banda Faizullah Khan c/o Tahir Mughal u/c Jhangi, ii. Jhangi Qazia u/c Jhangi, iii. Katha Kashmirian Mandrod c/o Ashiq Taj, iv. Maira Syedan Kakul c/o Safdar Zaid Khan, v. Lower Salhad Kund Nasrullah Bhutto) (4Nos H/pump in i. Maira Muzaffar c/o Shoukat Khan VC Nazim Mirpur, ii. Beer c/o Malik Fareed u/c Mirpur, iii. Mangal C/o Sarwar Khan, iv. Bandi Dhounadan c/o Malik Qamar u/c Banda Pir Khan

 

1089252

 

 

 

 

2%

 

 

 

 

1000

 

 

 

 

26-12-2017

10:30 AM

 

 

 

 

26-12-2017

12.00 PM

 

 

 

As per Work order

2

Water Tank Basement + 20Pipes 2 Inch Balolia Kakul

98920

2%

1000

-do-

-do-

-do-

3

PVC Pipe 3 Inch Sorjal u/c Pallak

99053

2%

1000

-do-

-do-

-do-

4

PCC Danna Masriyal u/c Pallak

197677

2%

1000

-do-

-do-

-do-

5

4Nos Hand Pumps different locations u/c Baldheri

494916

2%

1000

-do-

-do-

-do-

6

PCC Nikka Pani u/c Banda Pir Khan

197704

2%

1000

-do-

-do-

-do-

 

  1. Tender Form, BOQ, etc can be downloaded up to one day prior to the opening date from ADA web site (www.ada.gkp.pk/tms).
  2. Original Bid Security in the shape of call deposit in the name of Director ADA, Abbottabad shall accompany the bid.
  3. The bidders are required to submit their bids to office of ADA, Abbottabad through courier service in the following manner.
  4. ORIGINAL and each copy of the Bid shall be sealed and put in separate envelopes.
  5. The envelopes containing the ORIGINAL and copies will be put in one sealed envelope and addressed/identified as given at S/No. 3, Moreover the envelope received after specified time shall be returned unopened to the bidders vide letter No. KPPRA/M&E/Advice/11-65/2016-17/5085-8 dated: 15/08/2016.

 

  1. According to KPPRA Notification No. KPPRA/M&E/Estt:/1-5/2016 dated: 24/05/2016 the Contractors/Bidders who quote their bids/rates more than 10% below the Engineer’s Estimate shall submit an Additional Security in the form of call deposit equal to 8% of the Engineer Estimate Cost. In case the bidder quotes more than 10% below the tender cost (Engineer’s Estimate) and the bid is not accompanied by the additional security then the bid shall be considered as “Non-responsive” and the 2nd lowest bidder and so on will be considered accordingly.
  2. The contractors/firms shall quote their rates on ABOVE/BELOW SYSTEM as all tenders shall be processed according to above/below system on BOQ base on MRS-2017.
  3. All Federal & Provincial Duties/Stamp Duty/Taxes will be recoverable as per directives of the Government issued from time to time.
  4. If the evaluated bid costs of two or more than two bidders are same then the successful bid will be declared through draw.
  5. The employer has the authority to reject any bid or all the bids assigning valid reasons.
  6. The Tender form fee for each scheme should be attached with the Bid documents.

IMPORTANT NOTE FOR CONTRACTOR’S REGISTRATION WITH ADA, ABBOTTABAD

 “All the interested Registered/Enlisted Firms/Contractors with Pakistan Engineering Council (PEC) for the year 2017-18 C&W and Local Government Department Khyber Pakhtunkhwa in relevant category are requested to register their Firms/Contractor with Abbottabad Development Authority (ADA) Abbottabad after paying the requisite fee for issuance of Contractor Code/Password up to 19th December , 2017. It is to be noted that no one can participate in the tendering proceeding without the Contractor Code/Password of ADA, Abbottabad. It must be completed before downloading the BOQ/Tender Form.

 

© Copyright 2014. All Rights Reserved by Kaghan Development Authority.